Case · Construction · Construction company running six sites at once

The delay showed up in the monthly progress certificate, a month later. Now it shows up on Friday. And the site's client gets it too.

The site manager sends the daily report by WhatsApp. The system checks it against the schedule and every Friday builds an alert when a trade drifts and a one-page report for the site's client.

Sample data This case is built with sample data until the client's written permission exists. Real numbers get published with name, period and method.

4 → 1

weeks of lead time before a deviation shows up

How it was measured Difference between the date the report shows a deviation and the date of the monthly progress certificate, sites from May–August 2026.

The context

Buenos Aires · 70 people · 6 sites at once · schedule in MS Project, daily reports by WhatsApp, Google Drive.

Integrated with WhatsApp · construction schedule (MS Project) · Google Drive.

The capability Construction site tracking

  1. 01

    What nobody knew

    How far each site had drifted from the schedule, week by week. It was known at the certificate, when there was no room left to fix it.

    What was looked at, and what wasn't

    The site manager knew how his site was going, from memory. Management found out at the monthly meeting, with the certificate.

  2. 02

    What showed up when we looked

    In the first week, two of the six sites had a deviation of more than 10% in one trade: concrete in one, installations in the other. The installations one was a supplier that wasn't delivering, and nobody outside the site knew.

  3. 03

    What decision changed

    The supplier was changed three weeks before the site would have stalled. And something that wasn't in the plan: the weekly report with photo and deviation started going out to each site's client. Two months later, the construction company put it in the sales pitch, and two private tenders named it as a differentiator. Clients who get the report: 6 of 6. New sites where the report was part of the pitch: 2.

  4. 04

    What we built

    The site manager sends the daily report by WhatsApp, with photos. The system checks it against the schedule (progress by trade, against date) and every Friday builds two things: an alert to the site manager and management when a trade drifts more than 5%, with the cause the report states; and a report for the site's client, with progress, photo and deviation, on one page. What to do about the deviation is decided by the site manager with management.

    How it works

    How it works The daily report by WhatsApp, with photos The construction schedule The system Compares, detects, reports Compares Detects Reports Progress by trade against date, every Friday. Alert to site and management if a trade drifts more than 5% The one-page report for the site's client What to do about the deviation is decided by the site manager with management.
  5. 05

    How it's measured from here on

    Deviation by site and by trade every week, alerts with action taken, reports sent. Management looks at it Friday afternoon.

written permission from the client: name, number, period, quote

Let's talk

Are we the right fit for your company?

Tell us what's going on and we'll tell you frankly whether we can help, and how.

  • We reply within 24 business hours
  • The first conversation is free
  • We come prepared: you leave with three concrete things for this quarter, whether you continue with us or not.

Rather write?

We use your data only to reply. We don't share it or add you to any list unless you ask.